Initial Cushion Pressure (pwo)

The initial cushion pressure is the pressure before the wellbore casing is perforated or a downhole valve is opened to allow fluid flow into the wellbore.

Note:    This is only used in non-conventional analyses and models (i.e., Slug, PITA, CCT).